Rear Extension and Full Internal Reconfiguration – Montrose Court
For Montrose (H.K) Ltd, the job at Montrose Court was more than adding space: the whole interior was rethought around a new rear extension.
At a glance
- Location: London
- Time on site: 36 weeks
- Our role: Main contractor
What the work involved
- Construction of a new rear extension
- Total reconfiguration of the internal layout
- Refurbishment of the internals with all associated finishes
- Renewal of the electrical and mechanical installations
The challenge
When the layout changes as well as the footprint, the structure, services and finishes all move together. Running it as one project under one main contractor keeps the trades coordinated and the finish consistent from the extension right through the house.
How we delivered it
Heath Projects ran the job as main contractor, coordinating every trade from start to finish over 36 weeks on site. Our team has more than 30 years of experience, which means clear programmes, a detailed costing up front and no surprises along the way.
See the photos from this project
Planning something similar?
Find out more about our residential building work, or see our house extensions in South East London. We start with a free site visit and a detailed costing.